Palawan Electric Cooperative

PALECO_ICT

06:46 AM – GMA CIRCUIT – “ALD UNDER FREQUENCY” – (RESTORED – 06:59 AM)

Partial Power Interruption Final Update 3/11/23 7:11 AM Petsa: March 11, 2023 Oras Na Nawalan: 6:46 AM Apektadong Lugar: Under GMA CIRCUIT: Brgy. San Manuel, Brgy. San Pedro, Brgy. San Miguel, Naval Road, 570th Composite Tactical Wing Compound at Naval Compound Oras Na Naibalik: 6:59 AM Detalye: ALD under frequency. Ang aming paumanhin sa lahat […]

06:46 AM – GMA CIRCUIT – “ALD UNDER FREQUENCY” – (RESTORED – 06:59 AM) Read More »

03:19 AM – TOTAL BLACKOUT – “NASUNOG ANG DISCONNECTING SWITCH NG DELTA-P 13.8V TIE LINE SA LOOB NG PALECO SUBSTATION COMPOUND”

Total Blackout Update Petsa: MARCH 11, 2023 Oras Na Nawalan: 03:19 AM Apektadong Lugar: Puerto Princesa city, Narra, Roxas, Brooke’s point, S. Espanola at Taytay. Detalye: Nagsunog ang disconnecting switch ng Delta-P 13.8kV tie line sa loob ng PALECO substation compound. Oras na naibalik: Poblacion Initial – 05:22 AM Iwahig initial – 05:13 AM Wescom

03:19 AM – TOTAL BLACKOUT – “NASUNOG ANG DISCONNECTING SWITCH NG DELTA-P 13.8V TIE LINE SA LOOB NG PALECO SUBSTATION COMPOUND” Read More »

TARABIANGANBAYANIHAN PROGRAM (LINE CLEARING ACTIVITY)

“PALECO ay palaguin, ito ay atin!” TARABIANGANBAYANIHAN PROGRAM (LINE CLEARING ACTIVITY) Alinsunod sa mandato ng PALECO na makapagbigay ng maaasahang serbisyo sa kanilang mga Member-Consumer-Owners (MCOs) at sa layunin ng Pamunuan at mga Kawani ng Kooperatiba na mabigyang proteksyon ang mga linya ng kuryente mula sa mga suliraning dulot ng vegetation (mga gumagapang na halaman,

TARABIANGANBAYANIHAN PROGRAM (LINE CLEARING ACTIVITY) Read More »

PALECO CELEBRATES NATIONAL WOMEN’S MONTH

“PALECO ay palaguin, ito ay atin!” PALECO CELEBRATES NATIONAL WOMEN’S MONTH Bilang pagdiriwang ng National Women’s Month, dumalo sa isang information session/talk ang mga babaeng Kawani ng PALECO patungkol sa Reproductive Health, Family Planning and HIV Program sa APEC Conference Room, PALECO Compound ngayong araw, ika-10 ng Marso. VIEW ARCHIVE RECENT POST PALECO CELEBRATES NATIONAL

PALECO CELEBRATES NATIONAL WOMEN’S MONTH Read More »

01:03 PM – MANALO RECLOER – “AUTO RECLOSE DUE TO ALD (NAGTRIP ANG PPGI DG4 SA NARRA)

Partial Power Interruption Final Update 3/10/23 2:11 PM Petsa: March 10, 2023 Oras Na Nawalan: 1:03 PM Apektadong Lugar: Under MANALO RECLOSER: Brgy. Magkakaibigan, Brgy. Masikap, Brgy. Model, Brgy. Manggahan, Brgy. Maningning, Brgy. Tanglaw Oras Na Naibalik: 1:08 PM Detalye: Auto reclose due to ALD (Nagtrip ang PPGI DG4 sa Narra). Ang aming paumanhin sa

01:03 PM – MANALO RECLOER – “AUTO RECLOSE DUE TO ALD (NAGTRIP ANG PPGI DG4 SA NARRA) Read More »

PABATID: DISTRICT II ELECTION

“PALECO ay palaguin, ito ay atin!” PABATID: DISTRICT II ELECTION DISTRICT II ELECTION (Barangays Mandaragat, San Miguel, San Pedro, San Manueland San Jose of Puerto Princesa City) Nakatakdang halalan – March 18, 2023 Pagkatapos ng masusing pagsusuri ng mga dokumentong isinumite ng tatlong (3) kandidato sa District II election, nagpalabas ng desisyon ang Screening Committee noong ika-9 ng

PABATID: DISTRICT II ELECTION Read More »

04:37 PM – STA. MONICA RECLOSER – “TEMPORARY LINE FAULT” – (RESTORED – 05:54 PM)

Partial Power Interruption Final Update 3/9/23 6:50 PM Petsa: March 9, 2023 Oras Na Nawalan: 4:37 PM Apektadong Lugar: Under STA. MONICA RECLOSER: Brgy. Sta. Monica, Brgy. Sicsican, Brgy. Irawan, Brgy. Iwahig, Brgy. Montible, Brgy. Sta. Lucia, Brgy. Luzviminda, Brgy. Mangingisda. Oras Na Naibalik: 5:54 PM Detalye: Temporary line fault. Ang aming paumanhin sa lahat

04:37 PM – STA. MONICA RECLOSER – “TEMPORARY LINE FAULT” – (RESTORED – 05:54 PM) Read More »

PHP Code Snippets Powered By : XYZScripts.com