Palawan Electric Cooperative

PALECO_ICT

04:05 PM – SAN MANUEL RECLOSER – “LOAD SHEDDING DUE TO DE-RATED CAPABILITY OF PPGI UNITS: DG 2(3.8 TO 3.5MW), DG 3(4.5 TO 4.0MW) & DG 4(4.5 TO 2.2 MW).” – (RESTORED – 05:18 PM)

Partial Power Interruption Final Update 3/29/23 5:21 PM Petsa: March 29, 2023 Oras Na Nawalan: 4:05 PM Apektadong Lugar: Under SAN MANUEL RECLOSER: Brgy. San Manuel at Brgy. San Jose Oras Na Naibalik: 5:18 PM Detalye: Load shedding due to de-rated capability of PPGI Units: DG 2(3.8 to 3.5MW), DG 3(4.5 to 4.0MW) & DG […]

04:05 PM – SAN MANUEL RECLOSER – “LOAD SHEDDING DUE TO DE-RATED CAPABILITY OF PPGI UNITS: DG 2(3.8 TO 3.5MW), DG 3(4.5 TO 4.0MW) & DG 4(4.5 TO 2.2 MW).” – (RESTORED – 05:18 PM) Read More »

01:01 PM – MENDOZA RECLOSER – “LOAD SHEDDING DUE TO DE-RATED CAPABILITY OF PPGI UNITS: DG 2(3.8 TO 3.5MW), DG 3(4.5 TO 4.0MW) & DG 4(4.5 TO 2.2 MW).” – (RESTORED – 01:53 PM)

Partial Power Interruption Final Update 3/29/23 1:56 PM Petsa: March 29, 2023 Oras Na Nawalan: 1:01 PM Apektadong Lugar: Under MENDOZA RECLOSER: Brgy. San Jose, Brgy. Tagburos, Brgy. Sta. Lourdes hanggang Sitio Tagbato, Brgy. Salvacion. Oras Na Naibalik: 1:53 PM Detalye: Load shedding due to de-rated capability of PPGI Units: DG 2(3.8 to 3.5MW), DG

01:01 PM – MENDOZA RECLOSER – “LOAD SHEDDING DUE TO DE-RATED CAPABILITY OF PPGI UNITS: DG 2(3.8 TO 3.5MW), DG 3(4.5 TO 4.0MW) & DG 4(4.5 TO 2.2 MW).” – (RESTORED – 01:53 PM) Read More »

PHP Code Snippets Powered By : XYZScripts.com