Palawan Electric Cooperative

Partial Power Interruption Final Update 9/9/25 12:15 AM

Partial Power Interruption Final Update 9/9/25 12:15 AM
Petsa: September 9, 2025
Oras Na Nawalan: 11:29 PM
Apektadong Lugar: Under MENDOZA RECLOSER: Brgy. San Jose, Brgy. Tagburos,
Brgy. Sta. Lourdes hanggang Sitio Magarawak at iilang bahagi ng Brgy.
Sicsican.
Oras Na Naibalik: 12:11 AM
Detalye: Naka isolate pa ang linya ng line 3 sa may papasok ng Solid Waste.
Update:
1:01AM – Naibalik ang power mula solid waste hanggang purok Centro Dos.
Naka-isolate pa ang linya papuntang Mt. Calvary at Visapa, Irawan.
1:59AM Naibalik ang power sa purok centro dos hanggang Mt. Calvary at
Visapa, Irawan. Basag na insulator sa bahagi ng Visapa, Irawan ang naging
dahilan ng pagkawala ng power.
PHP Code Snippets Powered By : XYZScripts.com