Palawan Electric Cooperative

Partial Power Interruption Final Update 7/14/23 8:31 PM

Partial Power Interruption Final Update 7/14/23 8:31 PM
Petsa: July 14, 2023
Oras Na Nawalan: 8:11 PM
Apektadong Lugar: Under Resuma Recloser: Brgy. Irawan, Brgy. Iwahig, Brgy.
Montible, Brgy. Sta. Lucia, Brgy. Luzviminda, Brgy. Mangingisda.
Oras Na Naibalik: 8:29 PM
Detalye: Naka isolate pa ang linya ng Bucana sectionalizing hanggang
Mangingisda,Brgy, Napsan.
UPDATE : 2250H naibalik ang power sa Bucana sectionalizing hanggang
Mangingisda. Ayon sa lineman, wala naman silang nakitang fault sa linya.
Naka Isolate nalang ang linya ng Brgy. Napsan.
PHP Code Snippets Powered By : XYZScripts.com