Partial Power Interruption Final Update 4/9/25 5:03 PM
Petsa: April 9, 2025
Oras Na Nawalan: 3:49 PM
Apektadong Lugar: Under SAN JOSE CIRCUIT: Brgy. San Jose, Brgy. San Manuel,
Brgy. Tagburos, Brgy. Sta. Lourdes hanggang Sitio Magarawak at iilang
bahagi ng Brgy. Sicsican.
Oras Na Naibalik: 4:21 PM
Detalye: Automatic Load Dropping matapos magkaroon ng mekanikal na problema
at mag trip ang unit 1 ni Delta-p.
Petsa: April 9, 2025
Oras Na Nawalan: 3:49 PM
Apektadong Lugar: Under SAN JOSE CIRCUIT: Brgy. San Jose, Brgy. San Manuel,
Brgy. Tagburos, Brgy. Sta. Lourdes hanggang Sitio Magarawak at iilang
bahagi ng Brgy. Sicsican.
Oras Na Naibalik: 4:21 PM
Detalye: Automatic Load Dropping matapos magkaroon ng mekanikal na problema
at mag trip ang unit 1 ni Delta-p.