Palawan Electric Cooperative

Partial Power Interruption Final Update 4/23/24 4:55 PM

Partial Power Interruption Final Update 4/23/24 4:55 PM
Petsa: April 23, 2024
Oras Na Nawalan: 3:04 PM
Apektadong Lugar: Under PILTEL RECLOSER: Brgy. Maligaya, Brgy. Matiyaga,
Brgy. Mabuhay, Brgy. Liwanag, Brgy. Kalipay, Brgy. Masigla, Brgy. Maunlad,
Brgy. Pagkakaisa, Brgy. Princesa, Brgy. Bagong Silang, Brgy. Masipag
Oras Na Naibalik: 4:50 PM
Detalye: Emergency Load Shedding dahil sa Preventive Maintenance Schedule
ng isang unit ng Delta P (6.7MW) at biglaang pagbaba ng capacity ng isang
unit ng PPGI dahil sa mekanikal na problema (4.5MW to 3MW).
PHP Code Snippets Powered By : XYZScripts.com