Palawan Electric Cooperative

PALECO_ICT

PABATID SA MGA KAMAY-ARI: Apat (4) na araw na lamang, ating 43rd Annual General Membership Assembly (AGMA) na!

PABATID SA MGA KAMAY-ARI: Apat (4) na araw na lamang, ating 43rd Annual General Membership Assembly (AGMA) na! Ito ay sabayang idaraos sa Sabado, ika-17 ng Mayo, sa mga sumusunod na venue: • Edward S. Hagedorn Coliseum, Lungsod ng Puerto Princesa• Narra Municipal Gymnasium• Octagon Covered Court, Brooke’s Point• Roxas Municipal Gymnasium• Palawan State University

PABATID SA MGA KAMAY-ARI: Apat (4) na araw na lamang, ating 43rd Annual General Membership Assembly (AGMA) na! Read More »

ERC Greenlights 15-Year PSA between Paleco and Delta P, Paving Way for Lower Power Rates in Palawan

ERC Greenlights 15-Year PSA between Paleco and Delta P, Paving Way for Lower Power Rates in Palawan The Palawan ELectric Cooperative (Paleco) has secured provisional authority from the Energy Regulatory Commission (ERC) to implement its 15-year Power Supply Agreement (PSA) with Delta P, Inc., a subsidiary of Vivant Energy Corporation. This marks a significant step

ERC Greenlights 15-Year PSA between Paleco and Delta P, Paving Way for Lower Power Rates in Palawan Read More »

NOTICE OF VIRTUAL HEARING: ERC CASE NO. 2025-008 RC

In the matter of the joint application for approval of the transitory power supply agreement entered into by and between palawan electric cooperative and delta p, inc., with prayer for provsional authority and confidential treatment of information

ERC CASE NO. 2025-008 RC NOTICE OF VIRTUAL HEARING Share to Facebook RECENT POST NOTICE OF Read More May 13, 2025 Paleco, Ready Read More May 10, 2025 Inaanyayahan ang Read More May 6, 2025 HOLIDAY ADVISORY Read More May 1, 2025 PABATID SA Read More April 25, 2025 NOTICE OF Read More April 10,

NOTICE OF VIRTUAL HEARING: ERC CASE NO. 2025-008 RC

In the matter of the joint application for approval of the transitory power supply agreement entered into by and between palawan electric cooperative and delta p, inc., with prayer for provsional authority and confidential treatment of information
Read More »

Partial Power Interruption Final Update 5/12/25 3:46 PM

Partial Power Interruption Final Update 5/12/25 3:46 PM Petsa: May 12, 2025 Oras Na Nawalan: 2:43 PM Apektadong Lugar: Under POBLACION CIRCUIT: Brgy. San Pedro, Brgy. Mandaragat, Brgy. Matahimik, Brgy. Tagumpay, Brgy. Seaside, Brgy. Bagong Pag-asa Oras Na Naibalik: 2:55 PM Apektadong Lugar: Under PILTEL RECLOSER: Brgy. Maligaya, Brgy. Matiyaga, Brgy. Mabuhay, Brgy. Liwanag, Brgy.

Partial Power Interruption Final Update 5/12/25 3:46 PM Read More »

Partial Power Interruption Final Update 5/9/25 7:58 PM

Partial Power Interruption Final Update 5/9/25 7:58 PM Petsa: May 9, 2025 Oras Na Nawalan: 7:02 PM Apektadong Lugar: Under LACSAMANA RECLOSER: Brgy. San Pedro at Brgy. Tiniguiban Oras Na Naibalik: 7:54 PM Detalye: Damaged transformer sa Lacsamana Rd. Bgy. Tiniguiban ang dahilan ng pagkawala ng daloy ng kuryente. Naka isolate ang linya ng Lacsamana

Partial Power Interruption Final Update 5/9/25 7:58 PM Read More »

Paleco, Ready for the Upcoming Midterm Elections

Paleco, Ready for the Upcoming Midterm Elections The management and staff of Palawan Electric Cooperative (Paleco) assure its member-consumer-owners (MCOs) of the Cooperative’s preparedness for the upcoming midterm elections on Monday, May 12. “We know how important this day is for every Filipino. That’s why we’re doing everything we can to keep the lights on and

Paleco, Ready for the Upcoming Midterm Elections Read More »

PHP Code Snippets Powered By : XYZScripts.com