Palawan Electric Cooperative

PALECO_ICT

06:25 PM – LUCBUAN FEEDER 2 – “LOAD SHEDDING DUE TO DE-RATED CAPABILITY OF PPGI UNITS: DG 2(3.8 TO 3.5MW), DG 3(4.5 TO 4.0MW) & DG 4(4.5 TO 2.2 MW).” – (RESTORED – 07:11 PM)

Partial Power Interruption Final Update 3/29/23 7:17 PM Petsa: March 29, 2023 Oras Na Nawalan: 6:25 PM Apektadong Lugar: Under Lucbuan feeder 2: Brgy. Lucbuan hanggang Brgy. Langogan Oras Na Naibalik: 7:11 PM Detalye: Load shedding due to de-rated capability of PPGI Units: DG 2(3.8 to 3.5MW), DG 3(4.5 to 4.0MW) & DG 4( 4.5 […]

06:25 PM – LUCBUAN FEEDER 2 – “LOAD SHEDDING DUE TO DE-RATED CAPABILITY OF PPGI UNITS: DG 2(3.8 TO 3.5MW), DG 3(4.5 TO 4.0MW) & DG 4(4.5 TO 2.2 MW).” – (RESTORED – 07:11 PM) Read More »

04:05 PM – SAN MANUEL RECLOSER – “LOAD SHEDDING DUE TO DE-RATED CAPABILITY OF PPGI UNITS: DG 2(3.8 TO 3.5MW), DG 3(4.5 TO 4.0MW) & DG 4(4.5 TO 2.2 MW).” – (RESTORED – 05:18 PM)

Partial Power Interruption Final Update 3/29/23 5:21 PM Petsa: March 29, 2023 Oras Na Nawalan: 4:05 PM Apektadong Lugar: Under SAN MANUEL RECLOSER: Brgy. San Manuel at Brgy. San Jose Oras Na Naibalik: 5:18 PM Detalye: Load shedding due to de-rated capability of PPGI Units: DG 2(3.8 to 3.5MW), DG 3(4.5 to 4.0MW) & DG

04:05 PM – SAN MANUEL RECLOSER – “LOAD SHEDDING DUE TO DE-RATED CAPABILITY OF PPGI UNITS: DG 2(3.8 TO 3.5MW), DG 3(4.5 TO 4.0MW) & DG 4(4.5 TO 2.2 MW).” – (RESTORED – 05:18 PM) Read More »

PHP Code Snippets Powered By : XYZScripts.com