03:40 PM – LACSAMANA RECLOSER – “LOAD SHEDDING DUE TO DE-RATED CAPABILITY OF PPGI UNITS: DG 2(3.8 TO 3.5MW), DG 3(4.5 TO 4.0MW) & DG 4(4.5 TO 2.2 MW)” – (RESTORED – 05:11 PM)
Partial Power Interruption Final Update Petsa: March 30, 2023 Oras Na Nawalan: 3:40 PM Apektadong Lugar: Under LACSAMANA RECLOSER: Brgy. San Pedro at Brgy. Tiniguiban Oras Na Naibalik: 5:11 PM Detalye: Load shedding due to de-rated capability of PPGI Units: DG 2(3.8 to 3.5MW), DG 3(4.5 to 4.0MW) & DG 4( 4.5 to 2.2 MW). […]

