Palawan Electric Cooperative

PALECO_ICT

ALAM MO BA SAAN NAPUPUNTA ANG BINABAYAD MO SA PALECO?

“PALECO ay palaguin, ito ay atin!” ALAM MO BA SAAN NAPUPUNTA ANG BINABAYAD MO SA PALECO? Kamay-ari! Ating alamin kung saan napupunta ang ating binabayad sa PALECO:https://paleco.net/paleco/wp-content/uploads/2024/06/video_bayadsapaleco.mp4 VIEW ARCHIVE RECENT POST ALAM MO BA SAAN NAPUPUNTA ANG BINABAYAD MO SA PALECO? Read More GENERAL MANAGERS’ MONTH Read More MAGBAYAD NG INYONG BUWANANG BAYARIN GAMIT ANG GCASH […]

ALAM MO BA SAAN NAPUPUNTA ANG BINABAYAD MO SA PALECO? Read More »

OPERATION BAKLAS BAGING – BGY. MONTIBLE TO BGY. NAPSAN

“PALECO ay palaguin, ito ay atin!” OPERATION BAKLAS BAGING – BGY. MONTIBLE TO BGY. NAPSAN TINGNAN:Pagsasagawa ng Operation Baklas Baging mula Brgy. Montible patungong Brgy. Napsan kahapon, ika-11 ng Hulyo. VIEW ARCHIVE RECENT POST OPERATION BAKLAS BAGING – BGY. MONTIBLE TO BGY. NAPSAN Read More OPERATION BAKLAS BAGING SA RESUMA RECLOSER Read More OPERATION BAKLAS

OPERATION BAKLAS BAGING – BGY. MONTIBLE TO BGY. NAPSAN Read More »

BID BULLETIN #4: 40MW BASELOAD SUPPLY AND 15MW PEAKING SUPPLY OF POWER FOR THE PALAWAN MAIN GRID – SECOND PRE-BID CONFERENCE

“PALECO ay palaguin, ito ay atin!” VIEW ARCHIVE RECENT POST BID BULLETIN #4: 40MW BASELOAD SUPPLY AND 15MW PEAKING SUPPLY OF POWER FOR THE PALAWAN MAIN GRID Read More BID BULLETIN #3: 40MW BASELOAD SUPPLY AND 15MW PEAKING SUPPLY OF POWER FOR THE PALAWAN MAIN GRID Read More BID BULLETIN #2: 40MW BASELOAD SUPPLY AND

BID BULLETIN #4: 40MW BASELOAD SUPPLY AND 15MW PEAKING SUPPLY OF POWER FOR THE PALAWAN MAIN GRID – SECOND PRE-BID CONFERENCE Read More »

Partial Power Interruption Final Update 7/11/24 9:43 PM

Partial Power Interruption Final Update 7/11/24 9:43 PM Petsa: July 11, 2024 Oras Na Nawalan: 9:31 PM Apektadong Lugar: Under IWAHIG CIRCUIT: Brgy. Sta. Monica, Brgy. Tiniguiban Oras Na Naibalik: 9:40 PM Detalye: Emergency load dropping dahil nag trip ang unit ng PPGI PPC (4MW) upang maiwasan ang pagkaoverload at cascade tripping ng ibang makina

Partial Power Interruption Final Update 7/11/24 9:43 PM Read More »

Partial Power Interruption Final Update 7/11/24 12:21 PM

Partial Power Interruption Final Update 7/11/24 12:21 PM Petsa: July 11, 2024 Oras Na Nawalan: 12:13 PM Apektadong Lugar: Under MANALO RECLOSER: Brgy. Magkakaibigan, Brgy. Masikap, Brgy. Model, Brgy. Manggahan, Brgy. Maningning, Brgy. Tanglaw, Brgy. Bagong Sikat Oras Na Naibalik: 12:18 PM Detalye: Auto reclosed upon closing of Bonas sectionalizing due to scheduled line activity.

Partial Power Interruption Final Update 7/11/24 12:21 PM Read More »

OPERATION BAKLAS BAGING SA RESUMA RECLOSER

“PALECO ay palaguin, ito ay atin!” OPERATION BAKLAS BAGING SA RESUMA RECLOSER TINGNAN:Pagsasagawa ng Operation Baklas Baging sa Resuma Recloser (Brgy. Irawan, Brgy. Iwahig, Brgy. Montible, Brgy. Sta. Lucia, Brgy. Luzviminda, Brgy. Mangingisda) kahapon, ika-10 ng Hulyo.Ang nasabing operasyon ay magpapatuloy ngayong araw sa Brgy. Napsan. VIEW ARCHIVE RECENT POST OPERATION BAKLAS BAGING SA RESUMA

OPERATION BAKLAS BAGING SA RESUMA RECLOSER Read More »

PHP Code Snippets Powered By : XYZScripts.com