Palawan Electric Cooperative

PALECO_ICT

TOTAL BLACKOUT UPDATE

TOTAL BLACKOUT UPDATE November 21, 2023 as of 11:00 AM Oras na nawalan ng power: 9:29 AM Apektadong mga lugar: Lungsod ng Puerto Princesa, Munisipyo ng Roxas, Taytay, Dumaran (mainland), Aborlan, Narra, Brooke’s Point, Sofronio Española at Bataraza Detalye: Ayon sa initial report, nagtrip ang main circuit breaker ng Narra Thermal Power Plant at kasalukuyan

TOTAL BLACKOUT UPDATE Read More »

Partial Power Interruption Final Update 11/18/23 2:10 AM

Partial Power Interruption Final Update 11/18/23 2:10 AM Petsa: November 18, 2023 Oras Na Nawalan: 2:00 AM Apektadong Lugar: Under MENDOZA RECLOSER: Brgy. San Jose, Brgy. Tagburos, Brgy. Sta. Lourdes hanggang Brgy. Magarwak. Oras Na Naibalik: 2:07 AM Detalye: Automatic Load Dropping (ALD) matapos magkaroon ng mechanical problem ang DMCI Thermal Power Plant at kinailangang

Partial Power Interruption Final Update 11/18/23 2:10 AM Read More »

CAPACITY UPRATING NG LINE SEGMENT MULA 22ML4 TO BGY. ANTIPULUAN SA MUNISIPYO NG NARRA

“PALECO ay palaguin, ito ay atin!” CAPACITY UPRATING NG LINE SEGMENT MULA 22ML4 TO BGY. ANTIPULUAN SA MUNISIPYO NG NARRA Bilang bahagi ng selebrasyon ng Buwan ng Kooperatiba, nagsagawa ng isang symposium ang Palawan Electric Cooperative (PALECO) sa Palawan State Univeristy (PSU) kahapon, ika-26 ng Oktubre, na dinaluhan ng humigit-kumulang 170 mag aaral ng nasabing

CAPACITY UPRATING NG LINE SEGMENT MULA 22ML4 TO BGY. ANTIPULUAN SA MUNISIPYO NG NARRA Read More »

PHP Code Snippets Powered By : XYZScripts.com