Palawan Electric Cooperative

Power Service Advisory Final Update 7/29/26 4:16 PM

Power Service Advisory Final Update 7/29/26 4:16 PM
Petsa: July 29, 2026
Oras Na Nawalan: 3:31 PM
Apektadong Lugar: Under SAN JOSE CIRCUIT: Brgy. San Jose, Brgy. San Manuel,
Brgy. Tagburos, Brgy. Sta. Lourdes hanggang Sitio Magarawak at iilang
bahagi ng Brgy. Sicsican.
Oras Na Naibalik: 4:15 PM
Detalye: Nagkaroon ng ALD matapos mag trip ang GCB1 breaker 69kv
transmission line Simula DMCI aborlan papuntang narra kaya nawalan ng Suplly
ang DMCI thermal at nagtrip ang unit DG2 ni Deltap.
PHP Code Snippets Powered By : XYZScripts.com