Palawan Electric Cooperative

Partial Power Interruption First Update 3/29/23 1:52 PM

Petsa: March 29, 2023

Oras Na Nawalan: 1:51 PM

Apektadong Lugar: Under BUNCAG RECLOSER: Brgy. San Miguel, Brgy. Maningning, Brgy. Manggahan, Brgy. Bancao-Bancao, Brgy. Bagong Sikat

Detalye: Load shedding due to de-rated capability of PPGI Units: DG 2(3.8 to 3.5MW), DG 3(4.5 to 4.0MW) & DG 4( 4.5 to 2.2 MW).

Ang aming paumanhin sa lahat ng naapektuhan. Para sa katanungan, service request at iba pang concern maaari po kayong tumawag sa mga sumusunod na numero:
433-2001, 09175532836, 09989937849
PHP Code Snippets Powered By : XYZScripts.com