Palawan Electric Cooperative

Partial Power Interruption Final Update 3/30/23 3:48 PM

Petsa: March 30, 2023

Oras Na Nawalan: 1:10 PM

Apektadong Lugar: Under SAN MANUEL RECLOSER: Brgy. San Manuel at Brgy. San Jose

Oras Na Naibalik: 3:47 PM

Detalye: Load shedding due to de-rated capability of PPGI Units: DG 2(3.8 to 3.5MW), DG 3(4.5 to 4.0MW) & DG 4( 4.5 to 2.2 MW)
PHP Code Snippets Powered By : XYZScripts.com